For optimum protection any void between the air curtain and the wall should be sealed along the full.
Berner air curtain installation instructions.
Air curtain turns on when door is opened when the door closes the unit remains on until set delay time expires.
Curtain s mounted flush to the wall.
Our products at a glance air curtains air doors discover more.
If the air curtain must be mounted higher it must be spaced out from the wall 3 8 for every inch the air curtain is above the door opening.
Top of the door opening with the air curtain s mounted flush to the wall.
If the air curtain must be mounted higher it must be spaced out from the wall 3 8 for every inch the air curtain is above the door opening.
The split location should be located approximately 6 outside the doorway and approximately 12 above the floor.
Air flow adjustment for exterior insect control follow the air directional vanes instructions.
Berner air curtain bim revit cad files bimobject cad only industrial belt drive 20 ambient.
Curtains at least 1 inch from the top back front sides and at least 6 feet from the discharge of the air curtain.
Disconnect power at the service panel and have the air curtain inspected by a reputable electrician before reusing.
Do not operate any air curtain after it malfunctions.
Extreme caution is necessary when any air curtain is used by or near children or invalids and whenever the heater is left operating unattended.
Mount the air curtain following the interior mounting installation instructions except for air flow adjustment viii.
View and download berner maxair installation maintenance instructions manual online.
For optimum performance the bottom of the air curtain discharge nozzle should be no more than 1 above the top of the door opening with the air curtain s mounted flush to the wall.
800 245 4455 air curtains.
Zephyr maxair max1030 maxair max1036 maxair max1042 maxair max1048 maxair max1060 maxair max1072.
Data sheets csi specs bim models installation instructions product flyers.
Extreme caution is necessary when any air curtain is used by or near children or invalids and whenever the heater is left operating unattended.
Maxair zephyr series air curtain.
Consists of a door switch roller plunger or magnetic reed style a time delay and line voltage or 24 volt control.
If the air curtain must be mounted higher it must be spaced out from the wall 3 8 for every inch the air curtain is above the door opening.
How to video on how to properly install a berner industrial air curtain and then set the air stream for the most effective air seal.